Oracle Workflow - Best Practices and
Standards
1. Seeded process should not be
modified at all . The process to be copied & modified & attached where
ever required.
2. Naming standards to be followed.
3. Process to be validated.
4. Access level of the developer to
be decided.
5. Process should have valid start
point & end point
Checklist
at the time of delivery
1. Installation document to be prepared
( MD-120 )
2. WFLOAD should be used for
migration.
3. Underline packages are valid.
4. Notification mailer / other WF
setups done on the server.
5. Workflow
background process scheduled as per requirement.